The Council on Environmental Quality is continuing to carry out its mission while keeping both the public and our workforce safe during the COVID-19 pandemic. All submissions to the Council should be sent electronically to: peter.hearn@ct.gov

train passing wetlands

ENVIRONMENTAL MONITOR
The official site for project information under
the Connecticut Environmental Policy Act

June 8, 2004
Scoping Notices
There are no scoping notices at this time.
Environmental Impact Evaluations available for review and comment
        1. NEW!  Salmon River Flood Damage Control (East Hampton, Haddam, and East Haddam)
        2. Marlborough Sanitary Sewers (Marlborough and East Hampton)
        3. Burton Family Football Complex and Intramural, Recreational and Intercollegiate Athletic Facility (Storrs)
The next issue will be published on June 22, 2004.
Subscribe to e-alerts for The Environmental Monitor.

Scoping Notices

Scoping Notices have been issued for the following state projects.  These projects are in the earliest stages of planning.  At the scoping stage, detailed information on a project's design, alternatives, and environmental impacts does not yet exist.  Sponsoring agencies are asking for comments from other agencies and from the public as to the scope of alternatives and environmental impacts that should be considered for further study.  Send your comments to the contact person listed for the project by the date indicated.

There are no scoping notices at this time.

EIE Notices

The following Environmental Impact Evaluations have been completed by state agencies and are available for review and comment. 

1. EIE Notice for Salmon River Flood Damage Control

Municipalities where project is proposed:  East Hampton, Haddam and East Haddam

Address of Project Locations:  Powerhouse Road and Echo Farm Road, East Haddam

Project Description: The proposed project is construction of an ice control structure and sedimentation basin immediately upstream of the Leesville Dam on the Salmon River in East Hampton, Haddam and East Haddam. The project consists of a series of concrete piers and stone/concrete boulders spanning the main channel, a flow relief channel, and a sediment detention basin.  The project will prevent masses of ice from passing over the Leesville Dam and forming a blockage at and downstream of the Route 151 bridge and will reduce the amount of sediment flowing into the lower Salmon River.  Excavated material will be removed to a gravel pit within Echo Farm State Park.  Construction will impact approximately 1/2 acre of wetlands, which will be mitigated by the improvement of a wetland of comparable size, also at Echo Farm State Park.

Project Map:  Click here to view a project location map.  Click here to view a plan of the ice control structure and sedimentation basin.

The comment period for this document will begin on June 15, 2004 and comments will be accepted until the close of business onJuly 30, 2004

The public can view a copy of this EIE at:

Department of Environmental Protection, Bureau of Water Management, Inland Water Resources Division (3rd Floor), 79 Elm St., Hartford, CT 06106 or at the offices of the Town Clerks in East Haddam (Town Office Building at 7 Main St.), in East Hampton (Town Hall at 20 East High St.) and in Haddam (Town Office Building at 30 Field Park Dr.)

A link to the EIE can also be found online at the DEP website:  http://dep.state.ct.us/eie/index.htm

Any person can ask the sponsoring agency to hold a Public Hearing on this EIE by sending such a request to the address below by June 25, 2004.  If a hearing is requested by 25 or more individuals, or by an association that represents 25 or more members, the Department of Environmental Protection must schedule a Public Hearing.

Send your requests for a public hearing or comments about this EIE to:

Name: Eugene W. Robida, Civil Engineer III
Agency: Department of Environmental Protection
Bureau of Water Management
Inland Water Resources Division
Address: 79 Elm Street
Hartford, CT 06106
Phone: (860) 424-3706
Fax: (860) 424-4075
E-Mail: gene.robida@po.state.ct.us

If you have questions about a public hearing, or where you can review this EIE, or similar matters, please contact Mr. Robida as directed above.


2. EIE Notice for Marlborough Sanitary Sewers

Municipalities where project is proposed:  Marlborough and East Hampton

Project Description: The project involves the construction of sanitary sewers in the area immediately surrounding Lake Terramuggus, the Marlborough town center to the west of the junction of Routes 66 and 2, and the Marlborough Commons area to the east of Route 2. This project will eliminate the contamination of Lake Terramuggus and groundwater in the area due to sewage discharges from failing septic systems. Wastewater from the proposed service area will be collected by low-pressure sewer and force main. Capacity in the lake area will be sized to accommodate existing development, with minimal capacity for growth or expansion. Capacity in the town center will be sized to accommodate existing needs and projected growth, consistent with the town’s plan of development. Wastewater will be conveyed to East Hampton for treatment and disposal. The East Hampton Water Pollution Control Facility was designed to accept and treat flows from Marlborough and has adequate capacity to do so, without need for expansion.

Project Map:  Click here to view a map of the project area.

Comments on this EIE will be accepted until the close of business onJune 18, 2004

The public can view a copy of this EIE at:

Department of Environmental Protection, Bureau of Water Management (2nd Floor), 79 Elm St., Hartford, CT 06106 or at the office of the Town Clerk at the Marlborough Town Hall, 26 North Main Street, Marlborough.

A link to the EIE can also be found online at the DEP website:  http://dep.state.ct.us/eie/index.htm

Any person can ask the sponsoring agency to hold a Public Hearing on this EIE by sending such a request to the address below by May 14, 2004.  If a hearing is requested by 25 or more individuals, or by an association that represents 25 or more members, the Department of Environmental Protection must schedule a Public Hearing.

Send your comments about this EIE to:

Name: Dennis J. Greci, Supervising Sanitary Engineer
Agency: Department of Environmental Protection
Bureau of Water Management
Address: 79 Elm Street
Hartford, CT 06106
Phone: (860) 424-3751
Fax: (860) 424-4067
E-Mail: Dennis.Greci@po.state.ct.us

If you have questions about a public hearing, or where you can review this EIE, or similar matters, please contact Mr. Greci as directed above.


3. EIE Notice for Burton Family Football Complex and Intramural, Recreational and Intercollegiate Athletic Facility

This EIE Notice of Availability was published May 4, 2004. Information on a public hearing has been added – see details below.

Municipality where project is proposed: University of Connecticut – Storrs Campus, Mansfield

Address of Possible Project Location: Stadium Road

Project Description: The University of Connecticut proposes to construct the Burton Family Football Complex and Intramural, Recreational and Intercollegiate Athletic Facility (also referred to as the Burton Family Football Complex and Indoor Facility), a multi-purpose practice facility on Stadium Road at the site of existing tennis and volleyball courts.  The Burton Family Football Complex will be an approximately 80,000 SF building housing offices and facilities for the UConn Football Program. The approximately 85,000 square foot (SF) Indoor Facility will consist primarily of an indoor artificial turf field. The proposed project will require removal of the existing 12 tennis courts and 3 sand volleyball courts.  Both the tennis and sand volleyball courts will be relocated to a currently wooded area south of the Ice Arena and adjacent to Parking Lot I.  Nine outdoor tennis courts will be constructed to replace the existing courts that will be displaced by the Burton facility. Three additional tennis courts will be constructed, capable of being converted to an approximately 44,000 SF indoor tennis facility with bleacher seating. A clubhouse will also be located in this area.

Project Maps:  Location Map   Site Map

Comments on this EIE will be accepted until the close of business on: June 18, 2004

A public hearing has been scheduled for Thursday, June 10, 2004, 6:30 pm, at the Bishop Center, Room 7, Storrs Campus.

The public can view a copy of this EIE at:

Mansfield Town Clerk’s Office, Audrey P Beck Municipal Building, 4 South Eagleville Road, Mansfield, CT (ph: 860-429-3302).

Mansfield Public Library, 54 Warrenville Road, Mansfield, CT (ph: 860-423-2501)

Send your comments about this EIE to:

Name:

Richard A. Miller, Esq., Director of Environmental Policy

Agency:

University of Connecticut

Address:

Architectural and Engineering Services

31 LeDoyt Road U-3055

Storrs CT 06269-3055

E-Mail:

Rich.Miller@uconn.edu

If you have questions about the public hearing, or where you can review this EIE, or similar matters, please contact:

Name:

Same as above

Agency:

Address:

E-Mail:

Phone:

 860-486-8741

Other information: Comments may also be faxed to Mr. Richard Miller at 860-486-5477


The Adobe Reader is necessary to view and print Adobe Acrobat documents. To download the free software, click on the Get Acrobat button. This link will also provide information and instructions for downloading and installing the reader.

Button - Get Adobe Reader Download the free Acrobat Reader!
 

Access.Adobe is a tool that allows blind and visually impaired users to read any documents in Adobe PDF format.  For more information, go to Welcome to Access.Adobe.Com

Copyright 2002, Connecticut Council on Environmental Quality


V>